Harts Health and Safety Consultancy were appointed by the client to action as the Health and Safety Advisors on this project which was to construct a new basement. This involves installation of a permanent structural steel frame, temporary propping, additionally this included enabling works as well as the initial breakout of the existing property’s concrete floor.

Further works included the structural underpinning of the existing party walls, together with final excavation and installation of Delta membrane waterproofing system.